DHA Phase 6, Lahore

Grey Structure Construction in Lahore, Built to Carry Everything Above It

Foundation, columns, beams, slabs and brickwork — engineered and supervised by RN Construction, Lahore's trusted construction partner for 15 years.

15+Years Experience
250+Projects Completed
PKR 2,500–3,500Per Sq-Ft
GREY STRUCTURE STAGE
Scope of Work

What's Included in Grey Structure

Everything that gives your home its bones — completed to structural drawing before a single finish is applied.

01

Foundation & Footing

Excavation, PCC, RCC footing sized to soil and structural load.

02

Columns & Beams

RCC columns and beams per structural drawing and DHA bylaws.

03

Slab Casting

Roof and floor slabs cast with certified steel and cement ratios.

04

Brickwork

External and internal walls in brick or block masonry.

05

Damp Proofing

DPC layer at plinth level to stop rising damp.

06

Site Supervision

Dedicated site engineer overseeing every pour and stage.

Transparent Pricing
PKR 2,500 – 3,500per square foot, grey structure only
Final rate depends on plot size, structural design and material grade. Share your drawings on WhatsApp for a fixed quotation within 24 hours.
Our Advantages

Why Grey Structure Clients Choose RN

Three strengths that matter most at the structural stage, when mistakes are hardest to fix later.

Engineer-Supervised

Every pour and load-bearing element checked on-site by our engineering team, not left to labour judgement.

Fixed Pricing

Rate per square foot agreed before work starts — no revisions once the BOQ is signed.

Warranty Covered

Six-month warranty on structural defects and seepage, with free repairs for workmanship issues.

How It Works

Grey Structure, Stage by Stage

A fixed sequence, followed on every site, so nothing is skipped and nothing is guessed.

01

Site Visit

Plot assessment and soil check.

02

Design & BOQ

Structural drawing and material quantity.

03

DHA Approval

Map submission and NOC handling.

04

Construction

Foundation to roof, stage-wise.

05

Handover

Structure inspection and sign-off.

Why RN Construction

Built by People Who Work in DHA Phase 6

  • Office and site presence in DHA Phase 6 — not a call-center contractor.
  • 15+ years and 250+ completed projects across Lahore.
  • Fixed per-sq-ft pricing before work begins — no mid-project surprises.
  • Dedicated site engineer on every project, not a rotating crew.
  • DHA/LDA approvals and NOCs handled on your behalf.
Grey structure construction site in DHA Phase 6 Lahore by RN Construction
Common Questions

Grey Structure FAQs

What is included in the grey structure rate?

Foundation, columns, beams, slabs, brickwork and damp proofing — everything up to roof level, before flooring, plaster finish, electrical or plumbing fittings.

How long does grey structure take for a 5 marla or 10 marla house?

Typically 3–5 months for a 5 marla plot and 5–7 months for 10 marla, depending on design complexity and weather.

Do you handle DHA map approval?

Yes. We manage map submission, structural NOC and bylaw compliance so construction starts without delays.

Can grey structure and finishing be booked together?

Yes, most clients book both under one contract for a single supervised timeline. Ask us about combined packages.

Get a Fixed Grey Structure Quote Today

Send your plot size and location on WhatsApp — we'll reply with a quotation the same day.

WhatsApp Us Now →