Foundation, columns, beams, slabs and brickwork — engineered and supervised by RN Construction, Lahore's trusted construction partner for 15 years.
Everything that gives your home its bones — completed to structural drawing before a single finish is applied.
Excavation, PCC, RCC footing sized to soil and structural load.
RCC columns and beams per structural drawing and DHA bylaws.
Roof and floor slabs cast with certified steel and cement ratios.
External and internal walls in brick or block masonry.
DPC layer at plinth level to stop rising damp.
Dedicated site engineer overseeing every pour and stage.
Three strengths that matter most at the structural stage, when mistakes are hardest to fix later.
Every pour and load-bearing element checked on-site by our engineering team, not left to labour judgement.
Rate per square foot agreed before work starts — no revisions once the BOQ is signed.
Six-month warranty on structural defects and seepage, with free repairs for workmanship issues.
A fixed sequence, followed on every site, so nothing is skipped and nothing is guessed.
Plot assessment and soil check.
Structural drawing and material quantity.
Map submission and NOC handling.
Foundation to roof, stage-wise.
Structure inspection and sign-off.
Foundation, columns, beams, slabs, brickwork and damp proofing — everything up to roof level, before flooring, plaster finish, electrical or plumbing fittings.
Typically 3–5 months for a 5 marla plot and 5–7 months for 10 marla, depending on design complexity and weather.
Yes. We manage map submission, structural NOC and bylaw compliance so construction starts without delays.
Yes, most clients book both under one contract for a single supervised timeline. Ask us about combined packages.
Send your plot size and location on WhatsApp — we'll reply with a quotation the same day.