DHA Phase 6, Lahore

Complete Finishing Services That Turn a Grey Structure Into a Home

Flooring, plaster, electrical, plumbing, paint, kitchen and bathroom fittings — every finishing trade managed under one contract by RN Construction.

15+Years Experience
250+Projects Completed
PKR 3,500–4,500Per Sq-Ft
FINISHING STAGE
Scope of Work

What's Included in Complete Finishing

Every trade that turns four walls and a roof into a livable, move-in ready home.

01

Plaster & POP

Internal and external plaster finish with false ceiling where required.

02

Flooring & Tiling

Floor tiles, bathroom and kitchen tiling to selected specification.

03

Electrical Wiring

Complete concealed wiring, DB installation and fittings.

04

Plumbing & Sanitary

Water supply, drainage lines and sanitary fixture installation.

05

Paint & Polish

Interior and exterior paint, wood polish for doors and windows.

06

Kitchen & Bath Fit-Out

Cabinets, counters and fixtures for kitchen and bathrooms.

Transparent Pricing
PKR 3,500 – 4,500per square foot, complete finishing only
Final rate depends on material grade and finish level selected. Share your grey structure details on WhatsApp for a fixed quotation within 24 hours.
Our Advantages

Why Clients Trust RN for Finishing

Finishing is where quality is most visible — and most easily rushed. We don't rush it.

One Contract, All Trades

Electrical, plumbing, tiling and paint coordinated under a single team — no separate contractors to manage.

Material Transparency

Brand and grade of every material specified upfront in the BOQ, so there are no downgrades mid-project.

Warranty Covered

Six-month warranty on finishing workmanship, including tiling, plumbing leaks and electrical faults.

How It Works

Finishing, Stage by Stage

A fixed sequence that keeps every trade coordinated, so nothing overlaps and nothing is redone.

01

Material Selection

Tiles, fittings and paint shades finalized with you.

02

Electrical & Plumbing

Concealed wiring and pipework before plaster.

03

Plaster & Tiling

Walls, floors and wet areas finished.

04

Paint & Fixtures

Paint, kitchen and bathroom fit-out.

05

Handover

Final walkthrough and snag-list clearance.

Why RN Construction

The Same Team, From Foundation to Handover

  • Book grey structure and finishing together for one continuous timeline.
  • Office and site presence in DHA Phase 6 — not a call-center contractor.
  • Fixed per-sq-ft pricing agreed before work begins.
  • Dedicated site engineer supervising every finishing trade.
  • 15+ years and 250+ completed homes across Lahore.
Complete finishing work on a house in DHA Phase 6 Lahore by RN Construction
Common Questions

Complete Finishing FAQs

What is included in the complete finishing rate?

Plaster, flooring, tiling, electrical wiring, plumbing, paint, and kitchen/bathroom fit-out — everything needed to make the house move-in ready after grey structure.

Can I choose my own tiles and fittings brands?

Yes. We work within your preferred brands and budget, and specify everything in the BOQ before work starts.

How long does finishing take for a 5 marla or 10 marla house?

Typically 3–4 months for a 5 marla house and 4–6 months for 10 marla, depending on finish level.

Do you offer a combined grey structure + finishing package?

Yes — most clients book start-to-finish construction under one contract and one supervised timeline. Ask us for a combined quote.

Get a Fixed Finishing Quote Today

Send your grey structure details and finish preferences on WhatsApp — we'll reply with a quotation the same day.

WhatsApp Us Now →